424827
Victron Energy
0 Item Items
Warning: Last items in stock!
Availability date:
| Expedition under | 24 / 48 h |
Location of the maximum power point (MPPT) controller, allows the increase of load up to 30% compared to a PWM (BatteryLife) controller.
It ensures the effective management of a park of batteries, the Equalization of the optimal load and protection against short-circuits, overcurrent and polarity reversal.
Electronics encapsulated in resin allows a high resistance in marine environment.
Features:
